  1. 01

    Utility Outage Response Plan: Confirm the scope, desired outcome and engineering owner for this utility outage work.

  2. 02

    Verify the current facts with the appropriate hotel systems, logs, guest records or physical inspection.

  3. 03

    Complete the actions within Chief Engineer authority and escalate any safety, guest, revenue or policy exception promptly.

  4. 04

    Coordinate required handoffs with the affected department so the action is visible beyond one shift.

  5. 05

    Document the result, any exception and the next action before the work is considered complete.