← Back to Engineering
EngineeringSOP5 min read

Work Order Intake Procedure

Capture urgency, location, guest impact and ownership before work begins.

PRIMARY ROLEMaintenance Coordinator
USE WHENMaintenance Request

Operating standard

  1. 01

    Work Order Intake Procedure: Confirm the scope, desired outcome and engineering owner for this maintenance request work.

  2. 02

    Verify the current facts with the appropriate hotel systems, logs, guest records or physical inspection.

  3. 03

    Complete the actions within Maintenance Coordinator authority and escalate any safety, guest, revenue or policy exception promptly.

  4. 04

    Coordinate required handoffs with the affected department so the action is visible beyond one shift.

  5. 05

    Document the result, any exception and the next action before the work is considered complete.